Progress Monitoring
Plan Remotely
Monitor Remotely
Track
Remotely
Benefits
We will perform site surveys on 4 stages of your project:
During Pre-construction
-
Surveying available.
Up-to-date imagery and data on site before beginning construction.
Avoid last minute surprises and delays.
Begin earthwork on time.
Clearing and Earthwork
-
Confirm clearing is completed correctly.
-
Measure rack volumes of earthwork.
-
Monitor as frequently as needed.
-
Verify site development follows the project’s plans.
During the Mechanical Installation
Quantify the progress of equipment installation.
Compare report data to data from the field.
Follow the progression of all solar PV system equipment installed.
Reports include racking, leg/beam sets, assemble tables, modules, fencing, ballasts, etc.
Commissioning
File warranty claims and confirm all requirements have been met.
Ensure the solar PV system is safe and performing optimally.
Simplify your transition.
Minimize the transfer of risk.
How it works
Site Inspection
We get to the site and take pictures and evidence of the project’s progress.
Deliver
You will receive the reports on the progress of the projects within 24 hours after the inspection.
Access & download
your reports
- Downloadable and printable composite image of site
- Downloadable CAD format files
- Downloadable Point Cloud Mesh
- Exportable .PDF report document per flyover
- Exportable .CSV report file