Warning: Undefined array key "options" in /var/www/wp-content/plugins/elementor-pro/modules/theme-builder/widgets/site-logo.php on line 93
Proven results - Simply Drones
solar energy audit in mineapolis

Proven results

Facebook
Twitter
LinkedIn
WhatsApp
Proof points and industry use cases.

Warning: Undefined array key "margin_tablet" in /var/www/wp-content/plugins/elementor/core/files/css/base.php on line 783

Warning: Undefined array key "margin_mobile" in /var/www/wp-content/plugins/elementor/core/files/css/base.php on line 783

Warning: Undefined array key "padding_tablet" in /var/www/wp-content/plugins/elementor/core/files/css/base.php on line 783

Warning: Undefined array key "padding_mobile" in /var/www/wp-content/plugins/elementor/core/files/css/base.php on line 783

Service: Construction Monitoring

This client was looking for field data on the progress of their construction project. Utilizing our turnkey services, we delivered weekly reports through the pre-construction, clearing and earthwork, and mechanical installation stages and they completed the project on time.

solar energy audit in mineapolis
drone technology in minnesota

Service: PV System Inspection

1 MW PV System

This PV system inspection was performed on a 1 MWDC plant. The inspection took less than 60 minutes to complete, including setup, flights, and packing up. The drone inspection discovered 15.73% of the site’s energy production was affected. A total of 627 anomalies were identified, with 707 modules being impacted. This high number of PV system anomalies was estimated to lead to an annual loss of $8,264

solar energy audit in mineapolis
drone technology in minnesota

10 MW PV System

This PV system inspection was performed on a 10 MWDC plant. The inspection took half a day to complete, including setup, flights, and packing up. The drone inspection discovered 1.78% of the site’s energy production was affected. A total of 165 anomalies were identified, with 607 modules being impacted. This high number of PV system anomalies was estimated to lead to an annual loss of $14,836.

drone technology in minnesota
drone technology in minnesota

65 MW PV System

This PV system inspection was performed on a 65 MWDC plant. The inspection took two full days to complete, including setup, flights, and packing up. The drone inspection discovered 1% of the site’s energy production was affected. A total of 418 anomalies were identified, with 2,050 modules being impacted. This high number of PV system anomalies was estimated to lead to an annual loss of $31,828.

drone technology in minnesota
drone technology in minnesota

Related Posts:

drone technology in minnesota
Aerial Thermography

Case study of Inspection for solar asset

SITE SPECIFICATIONS

Location: Minnesota, United States
Size: 5.9 MWdc
Service: Turnkey Service and Report
Inspection Level: Raptor Standard
Reason for Inspection: Annual Inspection

Read More »
Solar Energy Survey in Minnesota
Concept Design

Residential Project

PV SYSTEM INFO

Production: 7.050 kWh
Consumption: 6.750 kWh
Access: 78%
Offset: 104%
Size: 8.1 kW

Read More »