Service: Construction Monitoring
This client was looking for field data on the progress of their construction project. Utilizing our turnkey services, we delivered weekly reports through the pre-construction, clearing and earthwork, and mechanical installation stages and they completed the project on time.
Service: PV System Inspection
1 MW PV System
This PV system inspection was performed on a 1 MWDC plant. The inspection took less than 60 minutes to complete, including setup, flights, and packing up. The drone inspection discovered 15.73% of the site’s energy production was affected. A total of 627 anomalies were identified, with 707 modules being impacted. This high number of PV system anomalies was estimated to lead to an annual loss of $8,264
10 MW PV System
This PV system inspection was performed on a 10 MWDC plant. The inspection took half a day to complete, including setup, flights, and packing up. The drone inspection discovered 1.78% of the site’s energy production was affected. A total of 165 anomalies were identified, with 607 modules being impacted. This high number of PV system anomalies was estimated to lead to an annual loss of $14,836.
65 MW PV System
This PV system inspection was performed on a 65 MWDC plant. The inspection took two full days to complete, including setup, flights, and packing up. The drone inspection discovered 1% of the site’s energy production was affected. A total of 418 anomalies were identified, with 2,050 modules being impacted. This high number of PV system anomalies was estimated to lead to an annual loss of $31,828.